Airfield Lighting Upgrades

Project Status: In progress
Project Cost: 0.6 Million
Engineer: AvCon, Inc.
Contractor: H.L. Pruitt Corporation  

The existing airfield wiring was installed sometime during early 1980s; thus, much of the lighting is worn and deteriorating. This project consists of the final design and construction of airfield lighting improvements. Specifically, the edge lighting will be replaced on Runway 13-31 and portions of Taxiway K. The directly buried edge lighting will be replaced with cans and conduit lighting. This project also includes conductor, conduit, duct markers, and any junction cans, ground rods, splice markers, and spare parts as necessary. 

Taxiways Alpha and Kilo Partial Realignment

Project Status: In progress
Project Cost: 1.7 Million
Engineer: Hanson Professional Services, Inc.
Contractor: C.W. Roberts Contracting, Inc.

The affected portion extends between the Taxiway run-up area at the approach end of Runway 31 and the intersection of Taxiway Bravo. The realignment of Taxiway Alpha enables the Taxiway to conform to the current FAA seperation standards applying to Runway 13-31 and Taxiway Alpha.

 